Three AFI facade projects: curtain wall on an office building in IKN, windows, doors and fins at Buddha Tzu Chi School PIK 2, and the ACP envelope of Solo Grand Mall.

Source: https://afi.id/en/projects  
Language: en-US  
Site: AFI · Alu Fasad Inovasi

## Proof that is already standing.

An office building in IKN, Indonesia's new capital; a school at Pantai Indah Kapuk 2 on the coast outside Jakarta; and a mall refit in Solo, Central Java. On the IKN project our structural calculations changed the facade specification before a single profile was ordered.

## Portfolio

These three ran between 2024 and 2026 and cover ±15,000 m² of facade. The figures come from contract scope, rounded.

- **Office building · IKN**
  Three towers in IKN, with the facade specification recalculated.
  Curtain Wall
  service-curtain-wall
  Complete
  2024–2025
  IKN, Penajam Paser Utara, East Kalimantan
  We installed ±10,000 m² of curtain wall across three office towers, with vertical and horizontal fins over the whole elevation.
- **Buddha Tzu Chi School · PIK 2**
  Windows, doors, fins and louvres on two buildings, under one contract.
  Windows & Doors
  service-windows-doors
  In progress
  2025–2026
  Pantai Indah Kapuk 2, Tangerang
  A school owned by the Buddha Tzu Chi foundation, made up of an Early Childhood building and a Multifunction building. Our facade contract comes directly from Agung Sedayu Group, which runs the project on the foundation's behalf, and on site we coordinate with the main contractor, PT Pulau Intan. The aluminium profiles are extruded by PT Damai Abadi, then fabricated and installed by our own team.
- **Solo Grand Mall**
  A new facade installed while the mall stayed open.
  ACP & Cladding
  service-acp-cladding
  Complete
  2025
  Jl. Slamet Riyadi, Solo, Central Java
  Solo Grand Mall began renewing its facade at the end of August 2025 and stayed open to shoppers throughout the work. The mall was rebranded Neo Solo Grand Mall at the same time. We built the ACP envelope, including ±450 m² of perforated panels across the main elevation, and the skylight over the entrance.